Unique infrastructures

Restoration and Conditioning of the Public Fountain Environment in Rois, parish of Cirio

Emplacement: Pol

Urban Waste Treatment Center in Vélez - Málaga

Emplacement: Málaga

Pena dos Gatos Ornamental Quartzite Quarry

Emplacement: Alto de Virín, Foz y Lourenza

Regulation Dam on the Cabe River

Emplacement: Monforte de Lemos

Channeling Plan for the Eo River in A Pontenova

Emplacement: A Pontenova

Budget: 246.528,00 €

Traffic Plan

Emplacement: Sarria

Sarria River Channeling Plan

Emplacement: Sarria

Budget: 7.168.826,00€

Hydraulic Management of the Sarria River in Ribela

Emplacement: Sarria

Budget: 269.000,00

Health Infrastructure in Lamaboa [Connection with General Service Networks]

Emplacement: Lugo

Budget: 997.143,00

Health Infrastructure in Lamboa [Connection with General Service Networks]

Emplacement: Lugo

Budget: 997.143,00

Execution of Hydrogen Production and Storage Facility in the Sotavento Wind Farm

Emplacement: Xermade

Budget: 402.111,00€

Eastern Corridor of Terra Chá, between DP 4401 and the Cantábrico Highway

Emplacement: A Pastoriza

Budget: 2.009.531,34 €

Urban Infraestructures Engeneering

Unique infrastructures