Unique infrastructures
Restoration and Conditioning of the Public Fountain Environment in Rois, parish of Cirio
Emplacement: Pol
Urban Waste Treatment Center in Vélez - Málaga
Emplacement: Málaga
Pena dos Gatos Ornamental Quartzite Quarry
Emplacement: Alto de Virín, Foz y Lourenza
Regulation Dam on the Cabe River
Emplacement: Monforte de Lemos
Channeling Plan for the Eo River in A Pontenova
Emplacement: A Pontenova
Budget: 246.528,00 €
Traffic Plan
Emplacement: Sarria
Sarria River Channeling Plan
Emplacement: Sarria
Budget: 7.168.826,00€
Hydraulic Management of the Sarria River in Ribela
Emplacement: Sarria
Budget: 269.000,00
Health Infrastructure in Lamaboa [Connection with General Service Networks]
Emplacement: Lugo
Budget: 997.143,00
Health Infrastructure in Lamboa [Connection with General Service Networks]
Emplacement: Lugo
Budget: 997.143,00
Execution of Hydrogen Production and Storage Facility in the Sotavento Wind Farm
Emplacement: Xermade
Budget: 402.111,00€
Eastern Corridor of Terra Chá, between DP 4401 and the Cantábrico Highway
Emplacement: A Pastoriza
Budget: 2.009.531,34 €
Urban Infraestructures Engeneering
Urbanization and provision of road services
Unique infrastructures